At this stage our MEP designer starts the works with basic consideration of design for calculation of heat loads to start with following MEP items to place.
Once's we receive the approval on the concept design we detailed the networks piping and the circuiting as follows.
Following we are MEP detailed use to covered:
After the final go ached of detail design, we produce the construction stage drawing with proper dimension and section. To make ready of site execution.
After the final go ahead of detail, our engineering team use to start working on quantity take off and prepare bill of quantity with one make as list.
After completion of construction, site team used to mark-ups changes made in site based on the actual execution.
Based on the mark-ups, we produced the as built model drawing inline with client requirement for final handover.